Server Room and Data Centre Cabling Specialists - Connectium LTD. The pressures of business often mean that your project needs to be done with the minimum downtime.
Avoiding the frequently expensive risk of failing to meet your target Go-Live timescale. To ensure a smooth transition, you may need the destination site to be fully pre-cabled and patched – before a single server or switch is disconnected. This means that on migration day (or night), each server, switch and ancillary equipment can be mounted in its rack and immediately connected to pre-installed cables.